Utilizza questo identificativo per citare o creare un link a questo documento:
http://hdl.handle.net/20.500.12386/30115
Titolo: | Final integration and alignment of LINC-NIRVANA | Autori: | Moreno-Ventas, Javier Bizenberger, Peter Bertram, Thomas RADHAKRISHNAN SANTHAKUMARI, KALYAN KUMAR Kittmann, Frank Baumeister, Harald MARAFATTO, Luca Mohr, Lars Herbst, Tom |
Data pubblicazione: | 2016 | Titolo del volume in cui è pubblicato il poster: | Ground-based and Airborne Instrumentation for Astronomy VI | Curatore/i del volume in cui è pubblicato il contributo: | Evans, Christopher J.; Simard, Luc; Takami, Hideki | Serie: | PROCEEDINGS OF SPIE | Numero: | 9908 | Da pagina:: | 99082Y | Abstract: | The LBT (Large Binocular Telescope), located at about 3200m on Mount Graham (Tucson, Arizona) is an innovative project undertaken by institutions from Europe and USA. LINC-NIRVANA is an instrument which provides MCAO (Multi-Conjugate Adaptive Optics) and interferometry, combining the light from the two 8.4m telescopes coherently. This configuration offers 23m-baseline optical resolution and the sensitivity of a 12m mirror, with a 2 arc-minute diffraction limited field of view. The integration, alignment and testing of such a big instrument requires a well-organized choreography and AIV planning which has been developed in a hierarchical way. The instrument is divided in largely independent systems, and all of them consist of various subsystems. Every subsystem integration ends with a verification test and an acceptance procedure. When a certain number of systems are finished and accepted, the instrument AIV phase starts. This hierarchical approach allows testing at early stages with simple setups. The philosophy is to have internally aligned subsystems to be integrated in the instrument optical path, and extrapolate to finally align the instrument to the Gregorian bent foci of the telescope. The alignment plan was successfully executed in Heidelberg at MPIA facilities, and now the instrument is being re-integrated at the LBT over a series of 11 campaigns along the year 2016. After its commissioning, the instrument will offer MCAO sensing with the LBT telescope. The interferometric mode will be implemented in a future update of the instrument. This paper focuses on the alignment done in the clean room at the LBT facilities for the collimator, camera, and High-layer Wavefront Sensor (HWS) during March and April 2016. It also summarizes the previous work done in preparation for shipping and arrival of the instrument to the telescope. Results are presented for every step, and a final section outlines the future work to be done in next runs until its final commissioning.... | Titolo del convegno: | Ground-based and Airborne Instrumentation for Astronomy VI | Luogo del convegno: | Edinburgh, United Kingdom | Periodo del convegno: | 26 June - 1 July 2016 | URI: | http://hdl.handle.net/20.500.12386/30115 | URL: | https://www.spiedigitallibrary.org/conference-proceedings-of-spie/9908/99082Y/Final-integration-and-alignment-of-LINC-NIRVANA/10.1117/12.2231690.full?tab=ArticleLink | ISSN: | 0277-786X | ISBN: | 9781510601956 | DOI: | 10.1117/12.2231690 | Bibcode ADS: | 2016SPIE.9908E..2YM | Fulltext: | open |
È visualizzato nelle collezioni: | 3.01 Contributi in Atti di convegno |
File in questo documento:
File | Descrizione | Dimensioni | Formato | |
---|---|---|---|---|
99082Y-4.pdf | Pdf editoriale | 2.96 MB | Adobe PDF | Visualizza/apri |
Page view(s)
94
controllato il 19-set-2024
Download(s)
59
controllato il 19-set-2024
Google ScholarTM
Check
Altmetric
Altmetric
Tutti i documenti in DSpace sono pubblicati ad Accesso Aperto, salvo diversa indicazione per alcuni documenti specifici.