BC-SIM-TR-012 HRIC ICO1 REPORT
Date Issued
2021
Author(s)
•
•
•
•
•
Doressundiram, alain
•
Langevin, Yves
•
•
Vincedon, Mathieu
•
Abstract
The present document has been issued to describe the Instrument Check Out Phase (ICO#1) Tests of HRIC channel of the Spectrometers and Imagers for MPO BepiColombo Integrated Observatory SYStem (SIMBIO-SYS).
Report number
97
Rights
open.access
File(s)![Thumbnail Image]()
Loading...
Name
BC-SIM-TR-012_-_HRIC_ICO#01_report.pdf
Description
ICO 01 HRIC report
Size
666.82 KB
Format
Adobe PDF
Checksum (MD5)
14ba8340a37b9987c9383f39cfb304b8