BC-SIM-TR-018 HRIC ICO2 REPORT
Date Issued
2022
Author(s)
•
•
•
•
•
Doressundiram, alain
•
Langevin, Yves
•
•
Vincedon, Mathieu
•
Abstract
The present document has been issued to describe the Instrument Check Out Phase (ICO#2) Tests of HRIC, channel of the Spectrometers and Imagers for MPO BepiColombo Integrated Observatory SYStem (SIMBIO-SYS).
Report number
134
Rights
open.access
File(s)![Thumbnail Image]()
Loading...
Name
BC-SIM-TR-018_-_HRIC_ICO#02_report.pdf
Description
report tecnico su operazioni check HRIC
Size
1.67 MB
Format
Adobe PDF
Checksum (MD5)
ac563a86918d77561a175dda825d6a70