MAORY requirements flow down and technical budgets
Date Issued
2018
Author(s)
•
•
•
•
•
•
•
Stadler, E.
•
•
•
Feautrier, P.
•
•
Abstract
MAORY is the ELT-MCAO system providing first-light wide-field correction for the near infrared imager and spectrograph MICADO. This paper provides an overview of the systems engineering processes and tools implemented to MAORY project during preliminary design phase and it illustrates, with some practical examples, the role of MAORY technical budgets to derive requirements on subsystems. One of the critical activities in systems engineering is the requirements managing. In line with this, the MAORY team devotes a significant effort to this activity, which follows a well-established process. This involves the MAORY requirements break-down to subsystems level and from here down to subsystems procurements specifications. This paper also presents an overview of the MAORY Technical Budgets. One task of the System Engineering is to manage the technical budgets at system level combining the contributors at subsystems level to meet the overall requirements.
Coverage
Adaptive Optics Systems VI
All editors
Close, Laird M.; Schreiber, Laura; Schmidt, Dirk
Series
Volume
10703
Start page
107034J
Conferenece
Adaptive Optics Systems VI
Conferenece place
Austin, Texas, United States
Conferenece date
10-15 June, 2018
Issn Identifier
0277-786X
Ads BibCode
2018SPIE10703E..4JC
Rights
open.access
File(s)![Thumbnail Image]()
Loading...
Name
107034J.pdf
Description
Pdf editoriale
Size
677.45 KB
Format
Adobe PDF
Checksum (MD5)
24527c5a210efa2f42c9b9bf40e442f8