Utilizza questo identificativo per citare o creare un link a questo documento:
http://hdl.handle.net/20.500.12386/33301
Titolo: | Euclid SGS Processing Budget Technical Note | Autori: | Dabin, Christophe McCracken, Henry Joy Belikov, Andrey Benson, Kevin MIGNOLI, Marco Starck, Jean-Luc Joachimi, Benjamin Branchini, Enzo FRAILIS, Marco Noddle, Keith Casenove, Pierre |
Data pubblicazione: | 2022 | Numero: | EUCL-CNE-RP-8-001 | Abstract: | This document gathers and summarizes the information from the latest performance figures from the Infrastructure and Scientific challenges reports. Release 4.2 of this document is based on the results and metrics from the Scientific Challenge 8 runs. It extrapolates these figures under assumptions clearly stated: for the prelaunch phase, simulation production plan, end-to-end scenarios, and operational rehearsal tests; for the post-launch phase, reprocessing ratio and simulation scenarios. This document highlights the most stringent assumptions and uncertainties about these figures, assesses the consequences of this processing budget on the SGS architecture, identifying bottlenecks, risks and action plans; it matches the infrastructure procurement strategy for the different stakeholders (SDC’s) of the Euclid Consortium with the infrastructure requirements derived from this document. This document is a living document: its origins are in the Preliminary Requirements Review with raw inputs and rough estimates from OU/SDC’s. This document will continue to be updated as necessary. | Note: | Version 1.0 reviewed by ESA at the Euclid SGS System Requirements Review (2015) Version 3.2 reviewed by ESA at the Euclid SGS Design Review (2017) Version 4.0 reviewed by ESA at the Euclid SGS Implementation Review (2021) Version 4.2 reviewed by ESA at the Euclid SGS Readiness Review (2022) | URI: | http://hdl.handle.net/20.500.12386/33301 | Fulltext: | reserved |
È visualizzato nelle collezioni: | 4.03 Rapporti di progetto |
File in questo documento:
File | Descrizione | Dimensioni | Formato | Existing users please |
---|---|---|---|---|
EUCL-CNE-RP-8-001_v4.2_Euclid_SGS-Budget_Processing_GSRR.pdf | [Administrators only] | 5.41 MB | Adobe PDF |
Tutti i documenti in DSpace sono pubblicati ad Accesso Aperto, salvo diversa indicazione per alcuni documenti specifici.