JIRAM Trending Review 2022
Date Issued
2022
Author(s)
Abstract
Purpose of this document is to provide engineering status of JIRAM instrument by reviewing instrument health and performance. The JIRAM Trending Review is required annually by the Juno Project.
JIRAM operated during PJ1 and from PJ4 through PJ44 .
This review cover the period PJ36-PJ44, so the first orbit of the Juno Extended Mission.
Volume
JRM-IAPS-TR-2022
Rights
embargo
File(s)![Thumbnail Image]()
Loading...
Name
JIRAM_TrendingReview2022.pdf
Description
Technical Report
Size
7.43 MB
Format
Adobe PDF
Checksum (MD5)
2fe1311d96c3e2483245d0657366a029