Planck sorption cooler system cop and cpv test plan
Date Issued
2009
Author(s)
Abstract
This document describes the test sequence and procedures of the Planck Sorption Cooler System
during Commissioning (COP) and Calibration (CPV) Phases in flight.
COP and CPV timelines depend on the specific subsystem considered: SCS, for example, will
complete its commissioning and verification phases well before the instruments. For this reason, it
will enter Routine Operations when HFI and LFI will still be in their CPV.
For each in-flight SCS test or activity all needed info is reported in a table containing test name,
description, constraints, duration, pass/fail criteria, operational requirements, procedures etc.
Volume
PL-LFI-PST-PL-014
Rights
open.access
File(s)![Thumbnail Image]()
Loading...
Name
SCS COP and CPV Test Plan_v1_02.pdf
Size
613.34 KB
Format
Adobe PDF
Checksum (MD5)
4457b084c6daf5eb188c0746cc543990