Please use this identifier to cite or link to this item:
http://hdl.handle.net/20.500.12386/33484
Title: | DPU-ASW Integration Test Report during NI AVM, EM-TV, and TV1/2/3 campaigns | Authors: | MEDINACELI VILLEGAS, Eduardo BALESTRA, Andrea FARINELLI, Ruben Dusini, Stefano SIRIGNANO, CHIARA FRANCESCHI, ENRICO |
Issue Date: | 2020 | Abstract: | This document is an evolution of the document EUCL-OPD-RP-7-013 DPU ASW EM-EQM Integration Test Report [RD-18] and Report for the DM-WE” [RD-12] and integrates the tests and logical approach of that document. It also integrates with RD-11, which describes the overall list of DPU directives with details on the implementation and test verifications. In the following sections the document reports the verification and integration procedures performed with the subsequent HW models received from the industry together with the different version of the provided BasicSW. | URI: | http://hdl.handle.net/20.500.12386/33484 | Fulltext: | reserved |
Appears in Collections: | 4.03 Rapporti di progetto |
Files in This Item:
File | Description | Size | Format | Existing users please |
---|---|---|---|---|
EUCL-IBO-TR-7-003_DPU-ASW Integration_Tests_Report_during_NI-AVM-EM-TV-TV1-2-3_campaigns.pdf | [Administrators only] | 8.37 MB | Adobe PDF |
Items in DSpace are published in Open Access, unless otherwise indicated.