Utilizza questo identificativo per citare o creare un link a questo documento:
http://hdl.handle.net/20.500.12386/33766
Titolo: | BC-SRN-RP-34268 | Autori: | DE ANGELIS, Elisabetta RISPOLI, ROSANNA COLASANTI, LUCA VERTOLLI, Nello MILILLO, Anna MURA, Alessandro |
Data pubblicazione: | 2016 | Numero: | BC-SRN-RP-34254 | Abstract: | This document reports the results of ELENA PFM (Flight Back-Up) calibration campaign, performed at MEFISTO facility in Bern on April 2015. The upgrades of the instrument have been verified, in particular the readout system and the black baffle. The results are considered in comparison with science performance requirement and FS model performances | URI: | http://hdl.handle.net/20.500.12386/33766 | Fulltext: | embargo_21000201 |
È visualizzato nelle collezioni: | 4.03 Rapporti di progetto |
File in questo documento:
File | Descrizione | Dimensioni | Formato | Existing users please |
---|---|---|---|---|
BC-SRN-RP-34254-01-04_ELENA_PFM_CalibrationReport.pdf | Calibration Report | 2.09 MB | Adobe PDF | Embargoed until 1 febbraio 2100 |
Page view(s)
47
controllato il 6-ago-2024
Download(s)
4
controllato il 6-ago-2024
Google ScholarTM
Check
Tutti i documenti in DSpace sono pubblicati ad Accesso Aperto, salvo diversa indicazione per alcuni documenti specifici.