SCS switchover operational approach
Date Issued
2010
Author(s)
Abstract
This document is intended to present a complete system-level definition of the SCS
Switchover activities, specifically for the switchover of SCS FM2 to FM1. The document shall
contain sufficient detail so that it can be used as the principle reference to manage the
switchover and all associated activities. All criteria that are pertinent to the execution of the
defined procedures shall be explicit in the sequence of events. The document shall also
address Contingency scenarios and recovery operations so that, as a minimum, the first level
of contingency action is defined and can be applied quickly should the need arise.
Volume
PL-LFI-PST-TN-094
Rights
open.access
File(s)![Thumbnail Image]()
Loading...
Name
SCS switchover operational approach_Iss_1.pdf
Size
823.7 KB
Format
Adobe PDF
Checksum (MD5)
cd42df3a9984ec44d1bde92517d4a9c6