The VST telescope is going to be commissioned in Paranal, together with its main sub-systems, such as the Image Analysis and Auto-Guiding system. A preliminary work of fine tuning of each sub-system has been performed in Italy before their shipping to Paranal, where they are waiting for the telescope AIV to be completed in a way to start the final commissioning of the overall system. Each unit has been extensively characterized and tested, with particular care to the Active Optics Shack-Hartmann sensor and to the Auto-Guiding arm. We describe here the phases concerning the integration and test of all the VST Auxiliary Units performed in Italy before their shipping to Paranal.
The VST auxiliary units: a status report before their commissioning in Paranal
FARINATO, JACOPO;SCHIPANI, Pietro;ARCIDIACONO, CARMELO;DE PARIS, GIACINTO;D'ORSI, SERGIO;FIERRO, DAVIDE;MAGRIN, DEMETRIO;MARTY, Laurent;RAGAZZONI, Roberto;
2010-01-01
Abstract
The VST telescope is going to be commissioned in Paranal, together with its main sub-systems, such as the Image Analysis and Auto-Guiding system. A preliminary work of fine tuning of each sub-system has been performed in Italy before their shipping to Paranal, where they are waiting for the telescope AIV to be completed in a way to start the final commissioning of the overall system. Each unit has been extensively characterized and tested, with particular care to the Active Optics Shack-Hartmann sensor and to the Auto-Guiding arm. We describe here the phases concerning the integration and test of all the VST Auxiliary Units performed in Italy before their shipping to Paranal.| File | Dimensione | Formato | |
|---|---|---|---|
|
773359.pdf
accesso aperto
Licenza:
Non specificato
Dimensione
7.78 MB
Formato
Adobe PDF
|
7.78 MB | Adobe PDF | Visualizza/Apri |
I documenti in IRIS sono protetti da copyright e tutti i diritti sono riservati, salvo diversa indicazione.


